Boker Magnum Long Lead EDC Black Pocket Knife
Regular price
£16.99
inc. VAT
Boker Magnum Long Lead EDC Black Pocket Knife
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use.
It’s simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components.
The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock.
The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).
Overall Length: 18.4cm
Blade Length: 8 cm
Blade Thickness: 2.7mm
Weight: 78g
Blade Material: 8Cr13MoV
Handle Material: G10
Opener: Nail Nick
Opening: Manual
Lock Type: Slipjoint
Colour: Black
Blade Colour: Uncoated